Project: a firm quote, after the framing and never before

From €8,000 excl. VAT. A two-week framing phase at €1,800, deducted if the project goes ahead, then fortnightly sprints with a deliverable each time.

A quote given before the framing is a false quote.

It is the practice of the market and it suits everybody at the time. The supplier prices quickly to stay in the race, the client compares amounts, and the project starts on a scope nobody has written down.

What follows is familiar. The quote was low, so the scope tightens along the way. Or the quote was high to cover the uncertainty, and you paid for that uncertainty. In both cases, the discussion moves to variation orders.

We do the opposite: a short paid framing phase first, a firm quote afterwards. And the framing is deducted if the project goes ahead, which means it costs you nothing if you see it through.

The paid framing phase, and why it is paid

Two to three weeks, €1,800, deducted from the project if it goes ahead. It is the most debated point of this plan, so it is worth explaining.

What it produces

  • The structural decisions settled, the ones that are expensive to change later: who will publish, which platform, which connections, what organisation after delivery.
  • A written scope, with the list of what will be done and the list of what will not. The second is the one that protects the project.
  • A firm quote, and a roadmap you can execute.

Why we charge for it

Because a free framing phase is a rushed one. The work is real: workshops, analysis of what exists, decisions, writing. Charging for it guarantees it is done seriously on both sides, and it filters out enquiries that will go nowhere.

Why we deduct it

Because it is not a separate service, it is the first stage of the project. If you see it through, it has cost you nothing. If you do not, you leave with a usable document, usable by another supplier too, and that is accepted.

What sometimes happens, and which we prefer

The framing concludes that the project is not worth doing, or that a smaller piece of work is enough. That is a good result: it has saved you a budget far larger than €1,800.

How the project then runs

In fortnightly sprints, with a deliverable each time. That is not a methodological preference, it is a protection.

Why fifteen days

A project that shows nothing for two months has no way of knowing it is drifting, and discovers the gap at the point where it costs most to correct. A deliverable every fortnight makes drift visible while it is still repairable.

The corollary is that you will see imperfect versions early. That is normal, not an alarm signal.

The team

A squad of three to five specialists, assembled for your project, with a single contact who carries it end to end. You do not explain the same thing three times.

On delivery

Go-live, handover of skills and documentation. Then a follow-up subscription is offered, not imposed: a project delivered and left alone decays within months, but it is your decision and it is taken in full knowledge.

What makes a project slip

Three causes, and none is technical. A decision waiting for a meeting that is never scheduled. A scope reopened without the deadline being reopened too. And content that does not arrive. We flag all three the moment they appear, rather than absorbing them until delivery.

What the amount covers, and what is costed separately

From €8,000, and the firm quote comes out of the framing. Here is the breakdown, so a comparison with another quote is possible.

Always included

  • The framing and its decisions, deducted from the project.
  • The design of the templates, which is the real work.
  • The build, the launch and the redirects from what exists.
  • Handover to your team and the documentation for taking it over.

Costed separately, and why

Writing the content, because it depends on who takes it on and because it is almost always the critical path. Photographs and illustrations, because a shoot on site has nothing to do with a stock library. Connections to your business tools, because a CRM integration is a project in itself.

We take them out of the package deliberately. Including them would allow a rounder price, at the cost of a decision you would never see being made.

The variable that makes the price

It is not the number of pages or screens, it is the number of different templates and the number of connections to establish. It is also the simplest lever for adjusting a budget without degrading the result.

Which projects it is for, and which it is not

This plan covers pieces of work that have a beginning and an end.

What we deliver in this format

It is not for you if

Your need is a continuous flow of small requests: the Partner plan answers that better, and for less than a succession of quotes. Or your need is a simple site to keep alive without thinking about it: that is Presence.

And if you do not know yet

That is common, and it is exactly what our audits are for. Each starts with a thirty-minute diagnosis, free of charge, and produces a list of problems ranked by cost with an order of treatment. It is often the best first step when nothing has yet been measured.

The three mistakes that make a costing go wrong

They recur from one project to the next, and the framing exists precisely to deal with them before they cost anything.

1. Confusing the number of pages with the number of templates

It is the most frequent mistake, on both sides. Three hundred pages built on five models cost less than eight pages that are all different, because the work is in the model, not in filling it.

A quote priced by the number of pages is therefore either too expensive or unsustainable. It is the first thing we look at, and it is also the simplest lever for adjusting a budget without degrading the result.

2. Treating the content as a detail

On most projects, the critical path is not the build, it is producing the copy and the visuals. A technically finished job waits six weeks for content, and everybody blames everybody else.

So the framing settles explicitly who writes, when, and what happens if the content does not arrive. That is not a defensive clause, it is what makes a deadline possible.

3. Discovering the connections along the way

“It will also have to feed into the management software.” That sentence, spoken in week six, turns one project into two. An integration with a business tool is a piece of work in itself, with its own unknowns, and it is sometimes found to be closed.

So during framing we list every tool to be connected and we check what it actually allows, rather than assuming. When a connection is not possible by standard means, it is better to know before signing.

What these three mistakes have in common

None is technical, and all are expensive because they are discovered late. That is exactly what €1,800 and two weeks allow you to avoid, and it is why the firm quote comes afterwards, never before.

How it runs

How it works

From framing to delivery, with a firm price.

  1. 1

    The framing, two weeks

    Scope, constraints, decisions. Charged at €1,800, deducted if the project goes ahead.

    YouTwo or three workshops.
    UsThe scope in writing: what will be delivered, what will not.
  2. 2

    The firm quote

    After the framing, never before. A figure given beforehand is wrong, one way or the other.

    YouDecide, with no commitment.
    UsA firm quote, from €8,000.
  3. 3

    The squad

    Three to five specialists chosen for your project, with a single contact who carries the file.

    YouOne person on your side who decides.
    UsThe team assembled and the calendar.
  4. 4

    Fortnightly sprints

    A deliverable at every sprint. You watch the project move in real time, you adjust, we correct.

    YouReview and approve at every sprint.
    UsA deliverable every fortnight, no tunnel effect.
  5. 5

    Delivery, then what follows

    Go-live, handover, documentation. A follow-up subscription is offered, it is not compulsory.

    YouOne handover session.
    UsThe project delivered, and control handed back.
Pricing

What it costs.

The amounts are those of our published price list. No quote is given before a conversation.

Framing
1 800 € excl. VAT, deducted

Two to three weeks. Deducted from the project if it goes ahead. You leave with a usable document in every case.


Included
Workshops and analysis of what exists
Structural decisions settled
A written scope, with what is excluded
A firm quote
A roadmap you can execute
Book a framing phase
Project

From

8 000 € excl. VAT

The firm quote comes out of the framing, never before. Fortnightly sprints, a deliverable at every sprint.


Included
A squad of three to five specialists
One contact, from end to end
A deliverable at every fortnightly sprint
Go-live and redirects
Handover of skills and documentation
A follow-up subscription offered, not imposed
Book a framing phase
Bespoke

Your need does not fit in a box?

That is the most common case. We frame it together, and we cost it on the real scope.

Talk about it
FAQ

Frequently asked questions.

Because a free framing phase is a rushed one: workshops, analysis of what exists, decisions and writing are real work. It is deducted if the project goes ahead, so it costs you nothing if you see it through.

You leave with the document: decisions settled, scope written, roadmap. It is usable by another supplier, and that is accepted. A framing phase useful only to us would not be a framing phase.

No, it is a firm quote. It moves only if you reopen the scope, and in that case the deadline moves with it, which is said at the moment the request arrives, not at the end.

Six to twelve weeks for most jobs, four months for a first version. What lengthens it most is not the technical side, it is approving the content and decisions that wait.

No, it is offered and not imposed. We do say clearly what happens without it: a project delivered and left alone decays within months. It is your decision, taken in full knowledge.

You do. The accounts are in your name, the data belongs to you, and you leave with the handover documentation. That is true on delivery as it is if you leave along the way.

A piece of work to cost seriously?

Fifteen minutes to understand the need, and tell you whether a framing phase is warranted.